Quality Steel Fabrication India — IS 800 Compliance and Inspection
Suncorporation maintains strict quality standards across all fabrication work. IS 800:2007 compliant fabrication with documented inspection at every stage — material receipt, cutting, welding, dimensional check, surface treatment and dispatch.
Quality Systems
Incoming material check against MTC. Visual and dimensional inspection.
Visual weld inspection, DPT and UT as per IS 822 and AWS D1.1.
Dimensional verification against approved shop drawings before painting.
Final inspection checklist and dispatch documentation for every project.
IS 800:2007 and IS 2062 certified. Quality plan submitted with every project. Third-party inspection by TPIA and client QA team accommodated. Inspection documentation archived and available post-project.
Request a project quote