Structural Steel Fabricator Credentials and Quality Records

A structural steel fabrication enquiry should establish the required scope and the records needed for approval: material certificates, applicable welding procedures, welder qualifications, an inspection plan and release documentation. Send the drawing register and document checklist so availability, submission dates and responsibilities can be confirmed. See our fabrication process for scope guidance.

Documents to request before placing an order

Match each requested record to the work: steel grade and thickness, weld joint, inspection method, coating system and site scope. Check the document revision, validity and applicable range before accepting it for the order.

Confirm the scope and evidence

Confirm where fabrication will take place, who prepares shop drawings, which operations are included, how inspection is arranged and who is responsible for transport and erection.

Sun Corporation Fabricators & Engineers accepts structural steel fabrication and erection enquiries for industrial and infrastructure work. Workshop loading, delivery lots, inspection arrangements and any subcontracted operations must be agreed against the drawings and programme before order placement.

Use our enquiry page to send the required scope and document checklist.

Manufacturing Credentials at a Glance

  • Relevant experience — Request references showing the actual scope, dates and responsibilities for comparable steelwork.
  • Project-specific production programme — Workshop fabrication capacity at our Hyderabad, Telangana facility.
  • Project-specific records — Delivered across industrial and infrastructure sectors.
  • Design and fabrication basis — Confirm the applicable standards, amendments and approved drawings for the order. A code reference is not a company certification.
  • Site logistics — Confirm delivery access, transport responsibility and erection-team availability for the project location.
  • Scope split — Agree design responsibility, detailing, fabrication, coating, transport, erection and inspection interfaces in writing.

Workshop and Fabrication Capacity

The Hyderabad workshop handles industrial and infrastructure steel — standard building frames and pipe racks through heavy plate girders, crane runway beams, and process plant structures. Shop drawings are prepared in-house in Tekla Structures, with piece marks, weld details, bolt positions, and erection weights issued before cutting starts.

Parameter Capability Review purpose
Workshop location Hyderabad, Telangana, India Vendor site inspection, logistics planning
Monthly fabrication output Drawing review BOQ phasing and peak-month capacity review
Typical project size Package tonnage confirmed from the approved member schedule Production planning against the member schedule and delivery programme
Heavy plate range Material grade, thickness and assembly weight subject to technical review ROB girders, crane beams, vessels, heavy plant steel
Cutting and forming Cutting, drilling, forming and handling arrangements confirmed for the member schedule Dimensional control per IS 800:2007 Annex F
Welding processes SAW, SMAW, MIG / GMAW WPS / PQR submittal to PMC and EPC QA
NDT capability NDT methods, personnel qualifications and acceptance criteria agreed in the project ITP Bridge, heavy, and process plant weld inspection requirements
Surface treatment Shot blasting, primer, industrial painting per project specification Coating dossier at dispatch
Site erection Erection-team availability and site responsibilities confirmed for the package Single-contractor accountability to EPC

Quality Documentation to Agree for the Project

Agree the document register before production: required records, responsible parties, review status and file formats. Drawings, material certificates, welding records, inspection reports and handover records should identify the relevant member marks and revisions.

  • Mill Test Certificates (MTCs) — IS 2062 grade confirmation with heat number traceability for all structural steel sections and plate
  • Weld Procedure Specifications (WPS) and Procedure Qualification Records (PQR) — Qualified to IS 9595 for carbon and carbon-manganese steels; AWS D1.1 referenced where specified in the contract
  • Welder Performance Qualification (WPQ) records — Individual welder certification to IS 7307 for assigned process, position, and thickness range
  • Shop drawings and general arrangement drawings — Prepared in-house from the structural engineer’s approved design; issued for client and consultant approval before fabrication release
  • Inspection Test Plan (ITP) — Stage gates with hold and witness points aligned to the EPC QA plan
  • Non-destructive testing reports — UT, MPI, and PT records for welds requiring volumetric or surface inspection
  • Dimensional inspection records — Checked against IS 800:2007 Annex F fabrication tolerances
  • Surface treatment and coating records — Blast profile and paint dry film thickness readings where specified
  • Dispatch documentation — Packing list with piece marks and heat number cross-reference
  • Erection records — Method statement, plumb and level survey records per IS 800:2007 Annex G erection tolerances
  • Project quality dossier at handover — Compiled MTC, weld, dimensional, NDT, and coating records for close-out

Where the contract requires statutory or client-specified third-party inspection, inspector access is arranged during production so findings can be cleared before work progresses beyond practical correction.

Documentation scope follows project-specific contract requirements and project document registers.

In-House Technical Capabilities — Fabrication to Erection

Confirm the workshop location, fabrication operations, any subcontracted work and site erection arrangements during technical review. Record supervision, inspection and handover responsibilities in the agreed scope.

Scope under one contractor includes:

  • Shop drawing preparation from the structural engineer’s approved design drawings (Tekla Structures)
  • Steel procurement from approved Indian mills with incoming inspection and heat tagging
  • CNC cutting, drilling, forming, and assembly
  • Welding to the applicable procedure, with preheat and interpass temperature requirements defined for the material, thickness, joint restraint and hydrogen control
  • Project-specified weld and dimensional inspection
  • Shot blasting, primer, and industrial painting per specification
  • Transport and pan-India logistics
  • Crane-assisted site erection, alignment survey, and bolted connection completion

Shop drawing connections are checked against IS 800:2007 Section 10 against the approved structural design — Sun Corporation Fabricators & Engineers does not provide independent statutory structural design certification. Fabrication scope detail is on our structural steel fabrication India page. For manufacturer selection see structural steel fabricators in India. Heavy plate, crane girder, and vessel work is covered on heavy steel fabrication India. Erection scope is on structural steel erection India.

Welding Procedures and Welder Qualification (WPS / WPQ)

For welded steelwork, request the applicable WPS, supporting procedure qualification where required, and welder qualification records covering the joint, process, material and thickness range. Agree NDT methods, extent, personnel qualifications and acceptance criteria in the inspection plan. Confirm the contract standards before fabrication release.

Application Process Standard Qualification record
Building and industrial structures SMAW, MIG / GMAW IS 800:2007, IS 9595, IS 7307 WPS / PQR + WPQ per joint type
Highway ROB and plate girders SAW, SMAW IRC:24, IRS B1-2001, IS 9595 PQR + WPQ; UT on full-penetration butt welds
Railway foot over bridges SAW, SMAW IRS B1-2001, IS 800:2007 NDT-linked WPQ records
Metro viaduct and station steel SAW, SMAW, MIG IS 800:2007, IS 875 WPS bundle per EPC QA plan
Heavy plate — crane and plant structures SAW, SMAW IS 800:2007, IS 807 (crane steel), IS 9595 UT + MPI on critical welds
Storage tanks and vessels SAW, SMAW IS 803, API 650, ASME Section VIII where specified Shell seam WPS + NDT per code

Welding process detail is on custom welding services India.

Quality Control Workflow — Material Receipt to Site Handover

The Inspection Test Plan follows a six-stage workflow. Hold and witness points are agreed with the EPC contractor or PMC consultant at contract award and recorded in the project ITP before fabrication starts.

Stage QC checkpoint Record generated Record purpose
1. Material receipt MTC verification — grade, chemistry, dimensions; heat number tagging Incoming inspection log Material approval dossier
2. Shop drawing approval Dimension freeze, connection detail, weld symbol review Approved shop drawing register GFC / design freeze gate
3. Cutting, fit-up, and welding WPS compliance, visual inspection, weld map update Production traveler / weld map Fabrication stage audit
4. Non-destructive testing UT, MPI, or PT per code and project specification NDT report per weld / batch Code compliance sign-off
5. Surface treatment and dispatch Blast profile, primer / paint DFT, final dimensional check Coating inspection report + packing list Dispatch and coating release
6. Site erection and handover Plumb, level, and alignment survey; bolt torque completion Erection survey records + quality dossier Project close-out and defects liability handover

Standards and Code Compliance Matrix

Structural steel is fabricated to the code governing each project sector. Shop drawing connections are checked against IS 800:2007 Section 10 against the approved structural design. Fabrication tolerances follow Annex F. Erection tolerances follow Annex G.

Standard Scope Applies to Design review purpose
IS 800:2007 Structural steel design, connections, fabrication and erection tolerances All structural steel buildings and general structures Primary design and fabrication basis
IS 2062 Hot-rolled structural steel — grades, chemistry, mechanical properties All sections and plate MTC approval and grade verification
IS 9595 / IS 7307 WPS / PQR qualification; welder performance qualification All welded fabrication Welding submittal review
IRC:24 Steel road bridge design and construction Highway ROB and plate girder bridges Highway authority tender compliance
IRS B1-2001 Railway bridge design and fabrication ROB, FOB, and railway crossing structures Railway EPC and state bridge packages
IS 875 Dead, imposed, wind, snow and special loads; earthquake design uses the applicable IS 1893 requirements Buildings, sheds, metro and long-span steel Load basis for design review
IS 803 / API 650 / ASME VIII Welded storage tanks and pressure vessels Process plant tank farms and vessels Plant EPC mechanical package review
AAI specifications Airport terminal, hangar, and airside building steel Greenfield and expansion airport projects Aviation authority submittal

Code reference detail for project owners is in our IS 800:2007 guide for industrial project owners and IS 2062 steel grades guide.

Fabrication Capability Matrix by Project Type

Project type Fabrication scope Package sizing Service page
Highway ROB Plate girders, cross beams, bracing, bearings interface steel Package tonnage confirmed from the approved member schedule ROB construction steel
State highway foot over bridges FOB truss and plate girder spans, staircases, landing platforms Package tonnage confirmed from the approved member schedule FOB fabrication India
Railway and metro Viaduct steel, station concourse frames, depot structures, rail-crossing ROB steel Package tonnage confirmed from the approved member schedule Metro rail steel structures
Airport terminals and hangars Terminal framing, long-span roof trusses, hangar structures, airside support buildings Package tonnage confirmed from the approved member schedule Airport steel structures
Industrial and process plant Pipe racks, equipment platforms, conveyor galleries, mezzanine floors, tanks Package tonnage confirmed from the approved member schedule Industrial steel buildings
PEB warehouses and sheds Portal frames, purlins, girts, crane brackets, cladding support steel Package tonnage confirmed from the approved member schedule Pre-engineered buildings
Heavy fabrication Thick plate girders, crane runway beams, vessels, equipment skids Package tonnage confirmed from the approved member schedule Heavy steel fabrication

Project documentation checklist

Use the checklist below to agree the records required for the order and confirm which documents are available, their submission stage and any project-specific review requirements.

# Document Format PMC use EPC use
1 Company profile and fabrication credentials PDF Vendor empanelment Pre-qualification submittal
2 Inspection Test Plan (ITP) PDF QA protocol alignment Contract QA plan integration
3 WPS / PQR / WPQ bundle PDF Welding procedure approval Sub-contractor welding qualification
4 Shop and GA drawings — approved for fabrication DWG + PDF GFC / design freeze Production release
5 IS 2062 mill test certificates PDF per heat Material approval Traceability audit
6 NDT reports (UT / MPI / PT) PDF per stage Weld quality sign-off Inspection dossier
7 Coating and blast inspection records PDF Specification compliance Coating acceptance records
8 Erection method statement and quality dossier PDF Site QA and close-out Handover and DLP records

Documentation scope follows project-specific contract requirements and project document registers.

Request Company Profile and QA Documentation Pack

Procurement teams, PMC consultants, and tender evaluation panels can request our company profile, workshop credentials summary, sample ITP structure, and standard documentation list. State your submission deadline; document availability and response timing are confirmed after review.

Request Documentation Pack

Pre-Submittal Checklist for Tender Evaluation Committees

EPC contractors and PMC consultants evaluating Sun Corporation Fabricators & Engineers for highway, railway, metro, airport, or industrial plant contracts can use this checklist during vendor pre-qualification:

  • ☐ IS 800:2007 compliance statement and fabrication scope confirmation on file
  • ☐ Workshop programme verified against BOQ peak fabrication month
  • ☐ WPS / PQR records applicable to project joint types reviewed
  • ☐ WPQ records current for assigned welder categories
  • ☐ ITP hold and witness points aligned with EPC QA plan
  • ☐ MTC traceability method confirmed — heat numbers linked to piece marks
  • ☐ NDT scope defined for bridge, heavy, or process plant welds per IRC / IRS / project spec
  • ☐ Erection team availability confirmed for project state and programme
  • ☐ Coating system matches project specification — blast grade and DFT records agreed
  • ☐ Reference work in relevant sector available on request — highway, railway, metro, airport, or plant EPC

Product, Sector and Project Evidence Index

Hub / sector Page Credential relevance
Core fabrication Structural steel fabrication IS 800:2007 workshop scope, shop drawings, QA process
Highway bridges ROB construction steel IRC:24, IRS B1-2001 plate girder fabrication
Foot over bridges Foot over bridge fabrication FOB and pedestrian bridge steel
Railway / metro Metro rail steel structures Viaduct, station, and rail-crossing steel
Airport Airport steel structures AAI specification compliant terminal and hangar steel
Industrial / plant EPC Industrial steel buildings Pipe racks, platforms, plant structures
PEB Pre-engineered buildings Warehouse and factory portal frame steel
Send fabrication enquiry Sub-contract scope and tender submittals
PMC review Request quality records Technical submittal and ITP review
Project references Request project references Sector references for highway, railway, metro, airport, and plant work
Company About Sun Corporation Fabricators & Engineers Company background and facts

For relevant project references, request the documented steelwork scope, dates and contact permissions through our enquiry page. Sector descriptions on this page are scope examples, not a list of completed projects.

Reference checks before fabrication release

Check the applicable Indian Standards and amendments through the BIS standards portal. Welding and inspection scope must follow the approved project specification. SCI / BCSA welding guidance provides general background; it does not establish this company’s qualifications or replace the contract requirements.

Frequently Asked Questions

What credentials does Sun Corporation Fabricators & Engineers supply for EPC tender submittals?

Request the company profile, relevant project references and the quality records applicable to your order. Agree the document register, availability and submission dates before relying on a credentials pack.

Is Sun Corporation Fabricators & Engineers’ structural steel fabrication IS 800:2007 compliant?

Confirm the project design basis, approved drawings and applicable standards in the order. Material certificates and inspection records should demonstrate the specified requirements. References to IS 800 or IS 2062 do not by themselves establish company certification.

What workshop fabrication capacity does Sun Corporation Fabricators & Engineers operate?

Send the member schedule, steel grades, plate thicknesses, assembly weights and required delivery dates. Production slots and release lots are confirmed after technical and programme review.

Does Sun Corporation Fabricators & Engineers sub-contract fabrication or erection?

Agree the workshop, site and any subcontracted scope in writing, including supervision, inspection, transport and erection responsibilities.

What welding standards and qualifications does Sun Corporation Fabricators & Engineers follow?

Request welding procedure and welder qualification records applicable to the specified material, process, joint and thickness range. Agree NDT methods, personnel qualifications and acceptance criteria in the project inspection plan.

What quality documents are included in a typical ITP?

A typical ITP covers incoming material inspection, shop drawing approval, fabrication and weld inspection hold points, NDT stages, surface treatment inspection, dispatch release, and erection survey records. Each stage produces named records — incoming inspection logs, weld maps, NDT reports, coating reports, packing lists, and the compiled project quality dossier at handover.

Can Sun Corporation Fabricators & Engineers supply documentation for highway, state bridge, and railway projects?

Send the authority requirements and document checklist with your enquiry. Applicable standards, approved drawings, inspection arrangements and records must be agreed for the specific bridge or railway package.

How quickly can Sun Corporation supply a structural steel fabricator credentials pack for EPC tender review?

Standard credentials packs — company profile, workshop capacity statement, WPS/PQR index, NDT personnel certificates, and QA/QC plan summary — are prepared on request. State your tender submission deadline when contacting us and we will confirm availability. Request via our enquiry page or email sales@mysteelfabricators.com.

Can PMC or third-party inspectors witness fabrication hold points at your workshop?

PMC and third-party inspector witness points at our Jeedimetla workshop can be arranged by prior appointment against a project-specific ITP. Contact us with your proposed hold point schedule.

Discuss Your Project and Documentation Requirements

Send your project sector, estimated tonnage, and tender or PMC review stage. Response timing and the required documentation are confirmed after review of the enquiry.

Get a Quote
Send fabrication enquiry

Credentials review usually sits alongside scope definition for industrial fabricated products, EOT crane girders, overhead pipe bridges, utility corridor racks, access stair towers, and steel truss packages.